• Phone: (860) 333-7834
  • connor@nextbusinessautomation.com

Uncategorized

Mystic Museum of Art
02 Sep. 2026

Mystic Museum of Art

We worked with the Mystic Museum of Art to program the building controls for their new HVAC system using Niagara software. Working alongside Deslandes Construction and their contractors, we oversaw the technical side of an entire HVAC revamp, replacing all of their old equipment with a new boiler, pumps, tanks, humidifiers, AHUs, dampers, and more. […]

18 Oct. 2025

Westerly Museum of American Impressionism

We worked with the Westerly Museum of American Impressionism (WMAI) from the first day of construction to plan low-voltage design, wireless access, phone systems, security, operational software, and more. This brand-new, 20,000-sq.-ft. museum required many connected features, including notifications and humidity monitoring to keep its 300+ paintings within acceptable climate-controlled ranges. Working with the Deslandes […]